Connectors for the continuation of the blowing-in processes: as soon as the maximum blowing-in length has been reached the speedpipe is opened and the blowing-in process is continued in exactly this position. The divisible connectors permanently connect the occupied speedpipe up to 0.5 bar and - for jetting in the complete length - gas- and water-tight up to 10 bar for 30 minutes.
Name | D (mm) | Pcs. / PU | Art. No. |
---|---|---|---|
EBM 7 | 7 | 12 | 10753 |
EBM 10 | 10 | 12 | 10786 |
EBM 12 | 12 | 12 | 10787 |
EBM 14 | 14 | 12 | 10788 |
EBM 16 | 16 | 12 | 1065 |
EBM 20 | 20 | 12 | 2516 |
Download description | Category | Last update | |
---|---|---|---|
EBM 20 | Assembly instructions | 23.02.2022 | |
EBM | Assembly instructions | 23.02.2022 | |
EBMAccess to the document, register here. | Technical data sheets | 12.08.2021 | |
EBM 20Access to the document, register here. | Technical data sheets | 12.08.2021 |