Connectors for the continuation of the blowing-in processes: as soon as the maximum blowing-in length has been reached the speedpipe is opened and the blowing-in process is continued in exactly this position. The divisible connectors permanently connect the occupied speedpipe up to 0.5 bar and - for jetting in the complete length - gas- and water-tight up to 10 bar for 30 minutes.
Download description | Category | Last update | |
---|---|---|---|
EBM 20 | Assembly instructions | 02.07.2020 | |
EBM | Assembly instructions | 02.07.2020 | |
EBM | Technical data sheets | 29.06.2020 | |
EBM 20 | Technical data sheets | 06.08.2020 |
Name | D (mm) | Art. No. | St. / VE |
---|---|---|---|
EBM 7 | 7 | 10753 | 12 |
EBM 10 | 10 | 10786 | 12 |
EBM 12 | 12 | 10787 | 12 |
EBM 14 | 14 | 10788 | 12 |
EBM 16 | 16 | 01065 | 12 |
EBM 20 | 20 | 02516 | 12 |