The cable or duct plough lays a microduct system in one go: open the duct trench, insert the bundle, reconstruct ground cover.
The SRV-G tc must be torn off the spool. Please particularly pay attention to a linear laying under tension (spool braked). Besides this laying provision please also consider eventually existing provisions of the manufacturer for ploughing in SRV-G tc, ducts or cables.
Source: Installation concepts in fibre optic expansion - Adams Consult (Whitepaper)
Download description | Category | Last update | |
---|---|---|---|
Laying Instruction SRV 50-8x10 | Installation instructions | 12.12.2022 | |
Laying Instructions SRV-G / SRV-G tc | Installation instructions | 07.03.2024 | |
Installation concepts in fibre optic expansionAccess to the document, register here. | Whitepaper | 23.12.2021 |