• speedpipe-ground-rohrverband-einpfluegen.jpg

    Ploughing in speedpipe ground bundles

A cheap and quick variant for the new construction of fibre optic routes outside localities.

Quickly lay many kilometers of speedpipe.

The cable or duct plough lays a microduct system in one go: open the duct trench, insert the bundle, reconstruct ground cover.

How it works

The SRV-G tc must be torn off the spool. Please particularly pay attention to a linear laying under tension (spool braked). Besides this laying provision please also consider eventually existing provisions of the manufacturer for ploughing in SRV-G tc, ducts or cables.

When can I use the ploughing method?

  • No consolidated road surface
  • No obstacles under the ground 
  • The position of external plants is known
  • No objections on the part of nature conservation

Our employees gladly are at your disposal!

No information will be transferred to third parties. I can revoke my consent to gabo Systemtechnik GmbH at any time. I can withdraw my consent at any time Send an E-Mail. Further information dealing with privacy povlicy can be found in the data privacy statement.
* Required fields
To Top
Contact

Any questions?

Feel free to give us a call!
or
Use the contact form