Connectors for the continuation of the blowing-in processes: as soon as the maximum blowing-in length has been reached the speedpipe is opened and the blowing-in process is continued in exactly this position. The divisible connectors permanently connect the occupied speedpipe up to 0.5 bar and - for jetting in the complete length - gas- and water-tight up to 10 bar for 30 minutes.
Download description | Category | Last update | |
---|---|---|---|
EBM 20 | Assembly instructions | 23.02.2022 | |
EBM | Assembly instructions | 22.02.2024 | |
EBMAccess to the document, register here. | Technical data sheets | 10.05.2023 | |
EBM 20Access to the document, register here. | Technical data sheets | 10.05.2023 |