Laying SRV-G tc in the open duct trench is suitable for any terrain and any section of broadband expansion.
In case of rocky or stony subsoil, the trench bottom must be excavated at least 0.15 m deeper and the excavation must be replaced by a stone-free layer (sand 0-2, with maximum grain size Ø 2 mm). After laying under tension, the cable section must be backfilled with sand up to 10 cm above the bundle peak (see ZTV-TK network 10 / 11)What is strictly to observe at an open trench?
For the trench bottom and the duct bedding only compactable and stonefree material (grainsize < 63 mm) may be used. Before the laying process the trench bottom must be gently vibrated with a compactor. Pay attention to an even compacting. Mechanical compacting equipment is not allowed under 30 cm depth of coverage.
Source: Installation concepts in fibre optic expansion - Adams Consult (Whitepaper)
Download description | Category | Last update | |
---|---|---|---|
Laying Instruction SRV 50-8x10 | Installation instructions | 12.12.2022 | |
Laying Instructions SRV-G / SRV-G tc | Installation instructions | 07.03.2024 | |
Installation concepts in fibre optic expansionAccess to the document, register here. | Whitepaper | 23.12.2021 |