To Top

Connectors for the continuation of the blowing-in processes: as soon as the maximum blowing-in length has been reached the speedpipe is opened and the blowing-in process is continued in exactly this position. The divisible connectors permanently connect the occupied speedpipe up to 0.5 bar and - for jetting in the complete length - gas- and water-tight up to 10 bar for 30 minutes.