gabocom | speedpipe® bundle ground SRV-G and SRV-G tc. Laying instructions.

speed•pipe® bundle ground gabo Systemtechnik SRV-G und SRV-G tc Laying instructions 41 For an optimal laying the speed•pipe® bundle must be uncoiled under tension because of physical reasons. For this the bundle has to be controlled decelerated during uncoiling. For the adjustment of the correct braking force, the laying temperature and the version of the speed•pipe® bundle is deciding. Generally, the breaking force has to be increased accordingly during low laying temperatures and high quantity of speed•pipe®. The permitted tensile forces (see point 18) aren’t allowed to be exceeded. LAYING INSTRUCTIONS: For a professional laying the following points have to be considered: 1. Laying of the SRV-G tc during the complete uncoiling under tension (from the first meter). For this purpose tighten possible loose layers on the spool before uncoiling. 2. Braking force. It is necessary: The more corrugated the laying is, the braking force has to be increased. The lower the outside temperature is, the braking force has to be increased. 3. After uncoiling fix the last layer of the SRV-G on the spool that the remaining layers on the spool cannot be untightened. Therefore, the requirements for the next uncoiling are prepared. Recommendation For an expert laying we recommend using professional equipment and refer to appropriate spool brakes. These spool brakes allow a constant and controlled brake during uncoiling of the bundle and avoid an uncontrolled unrolling. The compatibility with the according trailers and racks must be clarified with the respective producers. Important drum band brake company Vetter drum brake company Bagela drum brake company Thaler 16. Laying principles of SRV-G tc.

RkJQdWJsaXNoZXIy MTYzMjU=