speed•pipe® bundle ground gabo Systemtechnik SRV-G und SRV-G tc Laying instructions 35 1) Lead the SRV-G through the cutting unit. The complete SRV-G is thread through a cutting unit. In doing so the jacket pipe is lead to a cutter via the guiding element. cutting unit for jacket pipe manufacturer Vetter, Lottstetten, Germany 2) Installation pulling head. Cut all speed•pipe® ground of the SRV-G evenly and to the same length. The single speed•pipe® ground of the SRV-G are screwed together on the face at the appropriate pulling head. pulling head manufacturer Vetter, Lottstetten, Germany 3) Pulling in. The pulling head with the single speed•pipe® ground is attached to the towing rope and is pulled into the duct. During the pulling in process it is necessary to use lubricants. At the cutting unit the jacket pipe is separated from the speed•pipe® (the cutting unit must be sufficiently fixed to the ground). The distance from the coil to the cutting unit and from the cutting unit to the duct at least must amount to 5 m. Cutting device Duct 5 m 5 m Principal sketch: Pulling in speed•pipe® ground from the SRV-G. Procedure:
RkJQdWJsaXNoZXIy MTYzMjU=