gabo Systemtechnik speed•pipe® bundle ground Laying instructions SRV-G und SRV-G tc 32 Note: For reducing the friction during the pulling in process additionally a piece of jacket pipe can be attached over the cable grip. 1) Pull a piece of jacket pipe over the cable grip. 2.) Wrap textile tape over the ends of the covered piece of the jacket pipe. Pulling in the speed•pipe® bundle ground. • The speed•pipe® bundle ground is pulled in by means of a traction rope or a tube snake. • Assistance by employees at the coil (e. g. stopping and rotating) as well as at the launching / pulling manhole. • It is to be avoided that the speed•pipe® bundle ground is placed at the direct access area of the manholes. Therefore, consider the deflection at drawn through or connected SRV-G. • In case of short distances between the manholes the SRV-G can be drawn through using protection bends and pulling spouts. • In case the KKR is to be occupied with two speed•pipe® bundles ground, these can be pulled in one after the other or at the same time. • The use of lubricant is reducing the pulling in friction. 12.1 Pulling SRV-G into existing ducts (> Ø 80 mm).
RkJQdWJsaXNoZXIy MTYzMjU=