gabocom | speedpipe® bundle ground SRV-G and SRV-G tc. Laying instructions.

speed•pipe® bundle ground gabo Systemtechnik SRV-G und SRV-G tc Laying instructions 31 Mounting the cable grip. • Gradate speed•pipe® ground and jacket pipe to reach an equal power distribution of the whole SRV-G. Proceed like this: a) Trim the outer coat by approx. 500 mm. b) Buck the speed•pipe® ground in 70 mm gradations. • Protect every single speed•pipe® ground with end plugs ES or dust caps SK against the penetration of dirt and water. • Fold the end of the jacket pipe tight over the speed•pipe® ground and fix it with textile tape or similar. • Pull the cable grip over the jacket pipe of the speed•pipe® bundle ground and fix it with textile tape (winding each with 10 cm over the cable grip and the outer coat).

RkJQdWJsaXNoZXIy MTYzMjU=