gabo Systemtechnik speed•pipe® bundle ground Laying instructions SRV-G und SRV-G tc 30 Preparation. • Cleaning the ducts. • Testing and calibrating of the continuity of the duct. • Inserting a lubricant (read the information of the manufacturer). • Placing the laying carriage with the SRV-G (in linear direction to the manhole). • Use placement support tools to prevent damages to the coat of the SRV-G (e. g. manhole edge-roller, protection bend for cable). protection bend manhole edge-roller 12.1 Pulling SRV-G into existing ducts (> Ø 80 mm).
RkJQdWJsaXNoZXIy MTYzMjU=