gabo Systemtechnik Laying instructions. 12 speed•pipe® bundle SRV 50 / 8 x 10 Laying instructions. 6.2 Installation of the pulling grip. 1) Gradate speed•pipe® and jacket pipe to achieve a uniform force distribution on the entire SRV: cut back the jacket pipe for approx. 500 mm. crosscut the speed•pipe® in 70 mm gradations. 2) Seal the single speed•pipe® against the penetration of dirt and water with end plugs ES 10. 3) Bend the end of jacket pipe around the speed•pipe® and fix it with fabric tape. 4) Pull the pulling grip (Ø 50) onto the jacket pipe of the speed•pipe® bundle and fix it with fabric tape (bend respectively approx. 10 cm over pulling grip and jacket pipe). recommended product: transparent permanent end plugs
RkJQdWJsaXNoZXIy MTYzMjU=