gabo Systemtechnik Laying instructions 23 speed•pipe® indoor Network level 4 • The coil of the cable must be easily rotatable. • Ensure that the coil can be braked immediately in case of an unexpected stop. • Ensure the cable is clean. • Clean the speed•pipe® indoor (inside) with a clean cylindrical sponge. • Use a suitable blow-in device (for example, Vetter). • Use a compressor with a strong airflow, with max. pressure of 15 bar (1m3 air volume for speed•pipe® indoor to inside diameter 12 mm). • The air from the compressor should be clean, oil-free, dried and cooled down with an aftercooler to a temperature that is 8 °C to 10 °C higher than the ambient temperature. • The maximum blowing in speed should be limited to 80 m/min. • A cable guide head should be installed at the cable tip. • Use suitable lubricant (e. g. Vetter). • Pay attention to correct dosage according to manufacturer‘s instructions. • Spread the lubricant in the speed•pipe® indoor by means of a cylindrical sponge before blowing in the cable. Laying instructions. 5.4 Optimum blowing in micro cables / mini cables / bundle fibres. Laying instructions. 5.5 Use of lubricant.
RkJQdWJsaXNoZXIy MTYzMjU=